Case Studies

Coyotes Nightclub Heating Issues

Posted by on Mar 14, 2014 in Case Studies | Comments Off on Coyotes Nightclub Heating Issues

Coyotes Nightclub Heating Issues

A club in Sussex came to us to help them resolve an issue they had with noise complaints late at night. Too many of their customers were moving out of the club and into their outside/smoking area to cool off. When the club was full the temperature inside was reaching extremely uncomfortable levels. The result of too many customers outside was a significant rise in noise levels which had led to complaints. We calculated that a fairly hefty 20kw of cooling would be required. Taking into account the size and layout of the club we installed two 10kw Panasonic Wall units, one covering the dance...

Read More

Air Conditioning Install at Business in Paddock Wood

Posted by on Mar 14, 2014 in Case Studies | Comments Off on Air Conditioning Install at Business in Paddock Wood

Air Conditioning Install at Business in Paddock Wood

A business in Paddock Wood came to us with a dual requirement. Firstly they wanted us to refit a 10kw Daikin wall mounted unit into their main office. Because we had done the original removal of the indoor unit, the gas had been ‘stored’ correctly in the condenser and this was completed fairly simply by extending the existing copper pipes and wiring, and rehanging the unit into a new position. The second requirement was very specific. The company were setting up a showroom for antique musical instruments and it was important to maintain a constant temperature in the room where the...

Read More

Private House Refurb – Worthing

Posted by on Mar 14, 2014 in Case Studies | Comments Off on Private House Refurb – Worthing

Private House Refurb – Worthing

A newly acquired private house in Worthing was being refurbished and the owner was looking to have the benefit and comfort of air conditioning in his four upstairs bedrooms as well as being able to do away with the additional cost and hassle of radiators. In other words all year round climate control through single units. An additional consideration was that a loft conversion is also planned within the next five years. This ruled out a ducted system. The solution was to fit Fujitsu LM wall mounted units in each room, on outside walls, so that the pipework could run into the loft and around...

Read More